• 5 business day turnaround

    • Go / no-go + key risks + next actions

    • $5,500 + GST

    • Includes one site (add-ons available)

    • Covers

      • Site constraints and obvious fatal flaws including initial grid feasibility, planning overlays (incl. flood risk), topography

      • Revenue (screening) including high-level nodal pricing review at the nearest node

    • Best for quick ‘green light, red light’ before you spend more

    • 10 business day turnaround

    • Go / no-go + key risks + next actions + lay out strategic pathway for site

    • $12,500 + GST

    • Includes one site (add-ons available)

    • Covers:

      • High level grid connection pathway and capacity aligned to grid operator process realities and timelines

      • Consenting risk screening across disciplines and stakeholder review, including recommendation on consenting strategy

      • Revenue logic, including node-level price dynamics framing (volatility, constraint exposure) consistent with NZEM market design (screening level)

      • Development strategy, including recommended next steps and studies and sequencing to avoid rework

    • Best for investment committee / board conversations, or before proceeding to grid connection application, consenting and land commitments

    • 20 business day turnaround

    • Longlist + ranked shortlist + screening report + portfolio narrative

    • $35,000 + GST for one dedicated region / network area. Add-ons available

    • Covers:

      • Longlist 10-20 candidate areas/sites surfaced against your criteria

      • Shortlist: Top 3 sites screened to Tier 2 depth

      • Portfolio narrative: trade-offs by technology/strategy (e.g. BESS vs solar vs hybrid)

    • Best for developers building a pipeline wanting a genuine portfolio with options

This is decision-grade screening . It is deliberately structured to aid decision making and does not include detailed power systems engineering, lender-grade modelling, or legal drafting.